How CAMOs and Part-145 Organisations Identify, Control and Use ICAs under EASA 21.A.7

George Spiteri
How CAMOs and Part-145 Organisations Identify, Control and Use ICAs under EASA 21.A.7

Disclaimer:

For information only. This article is not legal or professional advice. Always refer to the current official EASA and EU texts and your organisation’s approved procedures. Use of this content is at the reader’s own risk.

 

Ask a room of continuing airworthiness engineers to define ICAs and most will start with the Aircraft Maintenance Manual. The answer is not wrong, but it is incomplete, and incompleteness is precisely the problem EASA set out to fix when it rewrote the Part 21 requirements. The AMM is one ICA document among many. The scheduled maintenance requirements, the structural repair data, the wiring practices, the fuel tank critical design configuration control limitations and the ICA supplement attached to every STC on your aircraft all belong to the same family.

This guide is written for the people who deal with that family every day: continuing airworthiness managers, maintenance programme engineers, technical records staff, Part-145 planners, certifying staff and compliance monitoring personnel. It covers where the requirement comes from, which documents count as ICAs, how to build a complete ICA list for an individual aircraft, and how the CAMO and the maintenance organisation each put ICAs to work.

 

What are Instructions for Continued Airworthiness?

At international level, ICAO Annex 8 (Airworthiness of Aircraft) sets out continuing airworthiness responsibilities for the State of Design and the State of Registry and requires maintenance information to be made available for type-certificated products. In the 13th Edition (July 2022) these provisions sit in Part II, Chapter 4 (Continuing airworthiness) and, for large aeroplanes, in Part IIIA, Chapter 10 (Continuing airworthiness – maintenance information).

In the European Union the requirement is implemented through Annex I (Part 21) to Commission Regulation (EU) No 748/2012. Since 18 May 2022 the core obligation has been consolidated in point 21.A.7, introduced by Commission Delegated Regulation (EU) 2021/699. It requires the holder of a type-certificate, restricted type-certificate, supplemental type-certificate, change approval or repair design approval to develop or reference the instructions necessary to ensure that the airworthiness standard of the product or article is maintained throughout its operational life.

 

What happened to 21.A.61?

A good deal of training material, and more than a few expositions, still cite 21.A.61. That point no longer exists. Regulation (EU) 2021/699 deleted 21.A.61 together with the parallel ICA points elsewhere in Part 21: 21.A.107 (changes), 21.A.120A (supplemental type-certificates) and 21.A.449 (repairs). Their content now sits in one place, 21.A.7 in Subpart A.

The recitals of the amending regulation explain why. ICAs are developed by design approval holders as part of certification, the old wording left room for different interpretations, and EASA wanted ICAs established as part of the type-certificate so that the holder's control over them was clear. If your procedures still refer to 21.A.61, correct the reference at the next revision. An outdated citation tells an auditor that the procedure has not been checked against the current rule.

 

What must ICAs contain?

AMC1 21.A.7(a) describes three things the ICAs should identify:

  • any limitations necessary for the continued airworthiness of the product or article;
  • the means of determining when the product or article has deteriorated to the point where it is no longer airworthy;
  • the minimum actions needed to restore airworthiness, as an alternative to withdrawing it from service.

Put simply, ICAs tell you what must not be exceeded, how to find out whether the item is still fit for service, and what to do if it is not.

 

When must ICAs be provided?

Under 21.A.7(b), a type-certificate holder must provide at least one complete set of ICAs to each known owner on delivery of the product or on issue of the first certificate of airworthiness, whichever is later. Holders of STCs, change approvals and repair design approvals have equivalent obligations towards known operators of the modified or repaired product. ICAs must also be made available on request to any other person required to comply with them. GM1 21.A.7(b) explains that this includes CAMOs and maintenance organisations working under contract with the owner or operator, and independent certifying staff.

Point 21.A.7(c) allows a limited derogation: certain long-lead scheduled maintenance ICAs may be completed after entry into service, provided they are available before they are needed. EASA Certification Memorandum CM-ICA-001 (Issue 01, May 2017) indicated that such delayed ICAs would typically be expected around two years before use and not less than one year before. The memorandum is non-binding and pre-dates 21.A.7, but it remains a useful indication of EASA's expectations. Changes to ICAs must be distributed to known operators under 21.A.7(d).

 

Which documents are ICAs?

GM1 21.A.7(a) gives a list of typical ICA publications and states that the list is neither exhaustive nor a minimum. ICAs can also be delivered through web portals and IT tools rather than printed manuals. For a large aeroplane, the ICA set will commonly include the following.

 

DocumentWhat it Covers?ICA Status
Aircraft Maintenance Manual (AMM)Servicing, inspection, testing, removal and installation, troubleshootingICA
Scheduled maintenance requirements (e.g. MRB Report)Scheduled tasks and intervalsICA
Airworthiness Limitations Section (ALS)Life limits, structural inspection items, CMRs, CDCCLs, limit of validity and other approved limitationsICA, EASA-approved and mandatory
Structural Repair Manual (SRM)Allowable damage and standard repairsICA
Illustrated Parts Catalogue (IPC)Part numbers, interchangeability, effectivityICA
Wiring diagram manual and standard wiring practicesEWIS maintenance and repairICA
Non-destructive testing manualInspection techniquesICA
Component Maintenance Manuals (CMMs)Off-aircraft maintenance of componentsICA only when identified as such by the DAH
Service BulletinsInspections, modificationsDepends on content and on the DAH's identification
STC and repair ICA supplementsMaintenance of the modified or repaired productICA of the STC or repair approval holder

 

Component Maintenance Manuals and supplier data

CMMs cause more confusion in Part-145 workshops than any other ICA question. EASA's answer is direct: "A CMM is becoming ICA only when identified as such by the DAH" (EASA FAQ n.136742, referring to AMC2 21.A.7(a)). Where the aircraft ICAs point to supplier data as the place where an instruction is found, AMC2 21.A.7(a) treats those instructions as incorporated by reference and part of the complete ICA set.

A CMM that is not ICA may still be usable. M.A.401(b) recognises maintenance instructions published by component manufacturers that are acceptable to the design approval holder. EASA also notes that the DAH can show the approval status of CMMs on a list (GM3 21.A.7(b)), rather than through a statement inside each CMM, because the same equipment may be fitted by several type-certificate holders.

 

Engines, propellers and APUs

Engine and propeller ICAs are provided by the engine and propeller type-certificate holders under their own 21.A.7 obligations. GM2 21.A.7(a) notes that they need not be included in the aircraft ICA, but GM4 21.A.7(b) keeps the aircraft TC holder responsible for integration and interface aspects. For the CAMO this means the aircraft ICA list is never complete until the engine, propeller and APU sources are added to it.

 

ICAs, maintenance data and mandatory requirements

Two distinctions matter in daily work. ICAs are a subset of maintenance data, and only part of the ICA set is mandatory in the strict sense.

Maintenance data is defined in M.A.401(b), and in ML.A.401(b) for aircraft under Part-ML. Part-145 organisations apply the same definition through 145.A.45(b). It covers requirements and instructions issued by the competent authority, airworthiness directives, ICAs issued by design approval holders, acceptable component manufacturer data and data issued under 145.A.45(d). ICAs are the part of that wider set which originates from a design approval holder and carries Part 21 obligations on completeness, availability and revision.

CategorySourceCan the AMP vary it?
Airworthiness Limitations Section (ALIs, CMRs, CDCCLs, LOV, life limits)DAH; approved by EASA as part of the type designNo. A variation needs an approved change to the ALS.
Airworthiness directivesEASA (21.A.3B) or State of DesignNo. Compliance required (M.A.303).
TCDS maintenance requirementsType-certificate data sheetNo.
Other ICA tasks (MRB Report, AMM, SRM, STC ICA)TC, RTC, STC, repair and ETSO holders (21.A.7)Yes, with justification under M.A.302(e), based on M.A.302(h) reviews.
Component manufacturer data acceptable to the DAHComponent manufacturerMaintenance data, not ICA.
Data modified by the maintenance organisation145.A.45(d)Only under an exposition procedure, with equivalent or improved standards and the author informed.

A note on terminology: Part 21 speaks of instructions for continued airworthiness, while Part-M, Part-ML and Part-CAMO use instructions for continuing airworthiness. Both terms refer to the same thing.

 

Certification specifications that shape ICA content

The content and format of ICAs follow from the certification basis of each product. The main references are:

ProductCertificationNotes
Large aeroplanesCS 25.1529 and Appendix H; CS 25.1729 (EWIS)Appendix H covers general requirements, format, content, the ALS (H25.4) and EWIS ICAs (H25.5).
Normal-category aeroplanesCS 23.2625Means of compliance are set out in the AMC & GM to CS-23.
RotorcraftCS 27.1529 and CS 29.1529 with Appendix AAppendix A includes an Airworthiness Limitations Section (A27.4 / A29.4).
EnginesCS-E 25Includes the engine airworthiness limitations.
PropellersCS-P 40
 
Sailplanes and APUsCS-22.1529; CS-APU (ICA requirement)Listed among the ICA specifications in EASA CM-ICA-001.

For large aeroplanes and rotorcraft, the ALS must be kept separate from the rest of the ICAs and must carry a statement that it is approved and that variations must also be approved. That single sentence explains why a CAMO cannot escalate an ALS item through its own programme approval route.

One further source is easy to miss. M.A.302(d)(2)(ii) requires the maintenance programme to comply with the ICAs included in the certification specifications referred to in 21.A.90B and 21.A.431B, which are the specifications for standard changes and standard repairs (CS-STAN). When a standard change is embodied, its maintenance instructions need to reach the AMP in the same way as an STC ICA supplement.

 

How to determine the list of ICAs for a specific aircraft

Part 21 tells the design approval holder what to provide. It does not tell the CAMO how to assemble the result for an individual aircraft. The method below is a practical approach built on the regulatory requirements. EASA does not prescribe it, so adapt it to your own CAME procedures and fleet.

 

Where the DAH tells you what the ICAs are

AMC1 21.A.7(b) expects the complete set of ICAs to be identified either directly in the TCDS or STC, or indirectly, for example through a listing in a principal manual or on the DAH's website. Revision levels should not appear in the TCDS. For changes and repairs, the DAH should either state what the ICA changes are or confirm that there are none, and that statement may be placed in the accomplishment instructions.

EASA has confirmed (FAQ n.136690) that this identification guidance applies to TCs and STCs certified after 18 May 2022, and to older approvals at the next opportunity of a TCDS, STC or STCDS update. Older fleets may therefore still lack a structured ICA listing, and the CAMO has to do more of the work itself.

 

A nine-step method for the CAMO

  1. Fix the configuration baseline. Establish the type-certificates and TCDSs for the airframe, engines, propellers and APU, the delivery configuration for the serial number, and every STC, change, repair and ETSO article embodied since. If the modification and repair records are incomplete, the ICA list will be too.
  2. Obtain the TC holder's ICA list from the TCDS, the principal manual or the DAH portal. Record each document, its revision and its effectivity for the serial number.
  3. Add engine, propeller and APU ICAs from their own type-certificate holders, and note the interface tasks the aircraft TC holder retains.
  4. Capture the ICA position for every STC, change and repair: either the ICA supplement or the DAH's statement that the ICAs are unchanged. Repairs with damage-tolerance-based inspection requirements frequently carry their own inspection programme.
  5. Include standard changes and repairs embodied under CS-STAN, which bring the instructions contained in that specification (M.A.302(d)(2)(ii)).
  6. Classify supplier data: CMMs identified by the DAH as ICA, supplier data referenced with the ICA, and component manufacturer data that is acceptable to the DAH but outside the ICA.
  7. Flag the mandatory items: ALS content, airworthiness directives and TCDS maintenance requirements. These cannot be escalated through the normal maintenance programme route.
  8. Map every ICA task into the AMP with a traceable source reference, and set up revision control: DAH subscriptions, a named owner for each source, and an ICA review whenever a modification or repair is embodied.
  9. Pass the right data to maintenance. Make sure the contract or work order with the Part-145 organisation states the applicable data and its revision status.

 

An ICA register makes the result auditable: one row per document, showing the design approval holder, the approval it relates to (TC, STC or repair reference), whether it is ICA, the current revision, the date last reviewed and the AMP tasks it feeds.

 

How the CAMO uses ICAs in the maintenance programme

The aircraft maintenance programme is where ICAs become operational. M.A.302(d) requires the AMP to demonstrate compliance with:

  • instructions issued by the competent authority;
  • the instructions for continuing airworthiness issued by holders of type-certificates, restricted type-certificates, supplemental type-certificates, major repair design approvals, ETSO authorisations and other relevant Part 21 approvals;
  • the instructions for continuing airworthiness included in the certification specifications for standard changes and standard repairs;
  • the applicable provisions of Part-26.

 

Developing and controlling the programme

Under Part-CAMO (Annex Vc to Regulation (EU) No 1321/2014), CAMO.A.315 makes the CAMO responsible for developing and controlling the maintenance programme, including any applicable reliability programme. Where the CAMO holds the privilege, programme amendments may be approved through the indirect approval procedure described in its exposition (M.A.302(c)).

 

Deviating from DAH instructions

ICA tasks are not frozen. M.A.302(e) allows the owner or CAMO to deviate from the design approval holder's instructions and propose escalated intervals, based on sufficient reviews under M.A.302(h), and to propose additional instructions. Indirect approval cannot be used to escalate safety-related tasks. The justification has to be data, usually from the reliability programme that M.A.302(g) requires for complex motor-powered aircraft whose programme is based on MSG logic or condition monitoring.

Mandatory items remain out of reach. Transport Malta's Information and Advisory Notice IAN 03A (Issue 04, June 2023) states that variations do not normally apply to ALIs or CDCCL items, nor to CMRs unless specifically agreed by the TC holder and approved by the authority.

 

Periodic review

M.A.302(h) requires the programme to be reviewed periodically and amended where necessary, so that it stays valid in light of operating experience and new or revised instructions from TC and STC holders. IAN 03A expects the review at least annually and expects each programme task to reference the source document it was derived from. A review that checks the latest MPD revision but ignores STC supplements, standard changes and repair data is not a complete review.

 

Part-ML aircraft

For aircraft under Part-ML (Annex Vb), ML.A.302 allows the maintenance programme to be based on the DAH's ICAs or on the Minimum Inspection Programme. In either case airworthiness directives, airworthiness limitations and CMRs remain mandatory.

 

How Part-145 organisations use ICAs

For a Part-145 organisation, ICAs arrive as maintenance data. Point 145.A.45 requires the organisation to hold and use applicable current maintenance data, defined by reference to M.A.401(b) or ML.A.401(b). In practice this involves four things:

  • Currency. The organisation needs a system that keeps maintenance data up to date and makes sure the revision used matches the aircraft or component being worked on.
  • Work cards. Tasks are transcribed onto work cards or worksheets that reference the source data. This is where ICA traceability becomes visible on the hangar floor.
  • Data discrepancies. Under 145.A.45(c), as amended by Regulation (EU) 2021/1963 (applicable from 2 December 2022), inaccurate, incomplete or ambiguous maintenance data must be recorded in the internal safety reporting scheme of 145.A.202 and notified to the author.
  • Modified instructions. Under 145.A.45(d), the organisation may modify maintenance instructions only in accordance with a procedure in its exposition, demonstrating equivalent or improved standards, and must inform the author.

The CAMO and the maintenance organisation have to agree which data applies. Where maintenance is contracted, CAMO.A.315 requires a written contract or work order, and that is the natural place to define the ICA set and its revision status.

 

MSG-3, MRB, CMRs and ageing aircraft

For most transport-category aircraft, the initial scheduled maintenance requirements are developed through the Maintenance Review Board process using MSG-3 logic. EASA Certification Memorandum CM-MRB-001 (Issue 02, November 2019) recognises MSG-3 as an appropriate methodology for developing initial minimum scheduled maintenance requirements. The resulting MRB Report forms part of the aircraft ICA, and the TC holder's Maintenance Planning Document then brings MRB tasks, ALS requirements and other tasks together for planning.

Certification Maintenance Requirements come from a different route. They arise from the system safety assessment, with guidance on their selection in AMC 25-19, and they sit in the Airworthiness Limitations Section. That is why they are mandatory, while MRB tasks can be escalated with justification.

Ageing aircraft requirements add another layer. Part-26 (Regulation (EU) 2015/640) and point 21.A.65 on continuing structural integrity require damage-tolerance-based inspection programmes and related data for large aeroplanes, which the CAMO must reflect in the AMP. IAN 03A notes the Part-26 deadline of 26 February 2024 for including damage-tolerance-based inspection programmes in the maintenance programmes of affected large aeroplanes.

 

ICAs and the management system

Part-CAMO and Part-145 both require a management system with hazard identification and compliance monitoring (CAMO.A.200 and 145.A.200). ICA control works best when it is part of that system rather than a separate technical records activity. Practical links include:

  • treating programme amendments that delete, escalate or replace ICA tasks as changes that receive a documented safety assessment;
  • routing Part-145 data discrepancy reports to the CAMO as well as to the author, so that the programme owner is aware of them;
  • including the ICA register and programme source traceability in the compliance monitoring programme;
  • recording late or missing DAH revisions and following them up with the design approval holder.

 

Typical gaps to look for

The following weaknesses are the ones the requirements above are designed to prevent. They are drawn from the structure of the rules and national guidance rather than from published EASA statistics, so treat them as an audit checklist rather than a measure of how often they occur.

  • STC ICA supplements that never reached the maintenance programme;
  • programme tasks with no traceable source reference;
  • tolerances applied to ALIs, CMRs or CDCCL items;
  • superseded revisions in use because nobody owns the DAH subscription;
  • CMMs used in the workshop without confirming their status with the DAH;
  • procedures and expositions still citing 21.A.61.

 

A note on the FAA approach

Organisations working across EASA and FAA environments should keep the two frameworks separate. In the United States the ICA requirement for type-certificate holders sits in 14 CFR 21.50(b), with content requirements in 14 CFR 25.1529 and Appendix H for transport aeroplanes. In August 2026 the FAA's ICA Aviation Rulemaking Committee, convened under Section 349 of the FAA Reauthorization Act of 2024, issued its final report. The report contrasts the FAA rules, which sit in the type-certificate subpart, with EASA's 21.A.7, which applies equally to TC, RTC, STC, change and repair approval holders.

Key takeaways

  • The EASA ICA requirement is 21.A.7 of Part 21. References to 21.A.61 are out of date.
  • The design approval holder defines what the ICAs are. The CAMO assembles the aircraft-specific list from every TC, STC, change, repair and standard change on the aircraft.
  • ICAs are a subset of maintenance data. Only the ALS, airworthiness directives and TCDS requirements are mandatory in the strict sense.
  • The AMP must trace every task to its source, and only non-mandatory ICA tasks may be escalated, with data to support the change.
  • Part-145 data errors are now safety reports under 145.A.45(c) and 145.A.202.

Frequently asked questions

What are Instructions for Continued Airworthiness (ICAs) under EASA?

ICAs are the instructions and information that a design approval holder must develop or reference under point 21.A.7 of Part 21 (Regulation (EU) No 748/2012) so that the airworthiness standard of a product or article is maintained throughout its operational life.

Is 21.A.61 still the EASA requirement for ICAs?

No. Delegated Regulation (EU) 2021/699 deleted 21.A.61, together with 21.A.107, 21.A.120A and 21.A.449, and consolidated the ICA obligations into point 21.A.7. The change applies from 18 May 2022.

Who is responsible for providing ICAs?

The holder of the type-certificate, restricted type-certificate, supplemental type-certificate, change approval or repair design approval. Engine and propeller ICAs come from their own type-certificate holders, and ETSO authorisation holders are also recognised as ICA sources in M.A.302(d).

How do I determine the list of ICAs for a specific aircraft?

Start with the ICA list the type-certificate holder identifies in the TCDS, a principal manual or its website (AMC1 21.A.7(b)). Add the engine, propeller and APU ICAs, then the ICA supplement or "no change" statement for every STC, change and repair embodied on that aircraft.

Is a Component Maintenance Manual (CMM) an ICA?

Only when the design approval holder identifies it as ICA (EASA FAQ n.136742, AMC2 21.A.7(a)). A CMM that is not ICA can still be used as maintenance data if it is acceptable to the design approval holder, as recognised in M.A.401(b).

What is the difference between ICAs and maintenance data?

Maintenance data, defined in M.A.401(b) and ML.A.401(b), is the wider set a maintainer must use: competent authority requirements, airworthiness directives, ICAs, acceptable component manufacturer data and other approved data. ICAs are the part issued by design approval holders under Part 21.

Which parts of the ICAs are mandatory?

The Airworthiness Limitations Section, which contains items such as life limits, structural inspection items, CMRs and CDCCLs, is approved by EASA and any variation must also be approved. Airworthiness directives and TCDS maintenance requirements are also mandatory.

Can a CAMO escalate ICA task intervals?

Yes, for non-mandatory tasks. M.A.302(e) allows deviations and escalated intervals based on sufficient reviews under M.A.302(h). Indirect approval cannot be used to escalate safety-related tasks, and Airworthiness Limitations Section items cannot be varied through the maintenance programme.

How do ICAs feed the aircraft maintenance programme?

M.A.302(d) requires the AMP to demonstrate compliance with competent authority instructions, ICAs from TC, RTC, STC, major repair, ETSO and other Part 21 approval holders, ICAs contained in the certification specifications for standard changes and repairs, and the applicable Part-26 provisions.

What must a Part-145 organisation do when ICA data is wrong?

Under 145.A.45(c), inaccurate, incomplete or ambiguous maintenance data must be recorded in the internal safety reporting scheme of 145.A.202 and notified to the author of the data.

When must ICAs be made available?

The type-certificate holder must provide at least one complete set on delivery or on issue of the first certificate of airworthiness, whichever is later. Under 21.A.7(c), certain long-lead scheduled maintenance ICAs may follow entry into service, provided they are available before they are needed.

Is the MRB Report part of the ICAs?

Yes. Scheduled maintenance requirements such as the MRB Report are among the typical ICA documents listed in GM1 21.A.7(a). For most large aeroplanes the MRB Report is developed using MSG-3, which EASA recognises in Certification Memorandum CM-MRB-001.

Do the 21.A.7 AMC apply to older type-certificates?

EASA FAQ n.136690 states that the ICA identification guidance applies to TCs and STCs certified after 18 May 2022, and to existing approvals at the next opportunity of a TCDS, STC or STCDS update.

How are ICAs used for Part-ML aircraft?

Under ML.A.302, the maintenance programme may be based on the design approval holder's ICAs or on the Minimum Inspection Programme. Airworthiness directives, airworthiness limitations and CMRs remain mandatory in either case.

Related reading and training

EASA aircraft maintenance programme requirements under M.A.302
EASA AMP Requirements & M.A.302 Compliance: A CAMO Guide

How the aircraft maintenance programme is built, approved and reviewed.

Read Article
EASA Part-26 additional airworthiness specifications
EASA Part-26 Additional Airworthiness Specifications

Regulation (EU) 2015/640 and what it adds to the maintenance programme.

Read Article
EWIS wiring chafe damage inspection
From TWA 800 to CDCCL: EWIS and Fuel Tank Safety Training

The background to the CDCCL and EWIS items found in today's ICAs.

Read Article
Managing repetitive aircraft defects under EASA M.A.403
EASA NPA 2025-12: M.A.403 Guidance on Repetitive Defects

How repetitive defects feed back into reliability and the AMP.

Read Article
EASA aircraft maintenance programme (AMP) development course for CAMO engineers
Training Course
EASA Aircraft Maintenance Programme (AMP) Development Course

Three days, live online: build and amend an AMP under M.A.302, route changes for direct or indirect approval, set intervals and use reliability data. Four practical exercises.

View Course
EASA Part-21 and Part-26 training for CAMOs and AMOs
Training Course
EASA Part-21 & Part-26 Training for CAMOs & AMOs

Initial airworthiness, design changes, modifications and Part-26 from the continuing airworthiness side.

View Course
Aircraft maintenance management training for CAMO and Part-M
Training Course
Aircraft Maintenance Management (CAMO & Planning)

Airworthiness rules, maintenance programme development and maintenance planning.

View Course

Our Services