EASA aircraft maintenance programme (AMP) development course for CAMO engineers - M.A.302 training

Build, Amend and Defend an EASA Aircraft Maintenance Programme

M.A.302 and Part-CAMO training for the engineers who develop AMPs

Course Code: AT-0026-00

3 Days MS Teams 4 Practical Exercises Certificate of Completion
Next Training: 20th, 21st and 22nd January 2027. Time 08:00 - 16:00 CET Three days, live and instructor-led on MS Teams
1200 € Enrol Now
3days, live on MS Teams
11modules, from M.A.302 to audit findings
4hands-on group exercises
28question final assessment, 75% pass mark

Course Overview

An aircraft maintenance programme (AMP) is the document that defines all scheduled maintenance for an aircraft. Under point M.A.302 of Regulation (EU) No 1321/2014, every aircraft must be maintained in accordance with one.

This three-day, instructor-led course is for CAMO engineers who develop, amend or review AMPs. It follows the job from start to finish:

  • reading the rules and the ICA package (MRB report, MPD, ALS);
  • building the AMP document to EASA's recommended structure;
  • routing every change for direct or indirect approval;
  • calculating due dates;
  • using reliability data to show the programme still works.

Each day ends with a practical exercise, worked in small groups on realistic training data and debriefed by the instructor.

Learning Outcomes

Apply the Right Rules: Decide whether Part-M or Part-ML applies to an aircraft, and identify who is accountable for its AMP under M.A.201 and CAMO.A.315
Build the AMP on the Correct Basis: Combine authority instructions and the ICA (M.A.302(d)) with ADs, Part-26, STC ICA and operational requirements
Read the MPD Like an Engineer: Classify each task by source, safety relevance, mandatory status and effectivity, including MSG-3 failure effect categories
Protect the Mandatory Layer: Carry ALS items, CMRs, CDCCLs, ADs and Part-26 requirements into the AMP exactly, and keep the AMP in step with ALS revisions
Write a Controlled AMP Document: Structure the AMP to EASA user guide UG.CAMO.00010-002 and check it against the TE.CAMO.00011-002 compliance checklist
Route Every Change Correctly: Decide between type design change, direct approval and indirect approval, using M.A.302(e) and EASA FAQs 19061 and 48248
Calculate Due Dates with Confidence: Apply thresholds, 'whichever first' limits, permitted variations and escalation without confusing them
Use Reliability Data: Calculate and read reliability indicators, and turn an alert into a justified, correctly routed corrective action
Handle the Special Cases: Address ETOPS, RVSM and LVO requirements, bridging between programmes, storage, Part-ML aircraft and common audit findings

Course Content & Topics Covered

Eleven modules and four practical exercises over three days. Open any module to see its topics, filter by day, search for a rule, or expand everything at once.

Day 1 — Foundations and sources

  • Course objectives and how the three days fit together
  • Navigating EUR-Lex and the EASA Easy Access Rules

  • Continuing airworthiness as a legal concept: Article 2(d), M.A.301 and M.A.201
  • The rule hierarchy: Basic Regulation (EU) 2018/1139, implementing rules, AMC, GM and national policy
  • How Regulation (EU) No 1321/2014 is built, and which Annex applies: CMPA, Part-M or Part-ML
  • Accountability: owner, operator and CAMO (M.A.201, CAMO.A.315)
  • Where AMP content is born: ICA and the ALS (21.A.7, 21.A.31), ADs, Part-26 and Air Ops requirements
  • Keeping the AMP current: review drivers and where to track regulatory change

  • The eight paragraphs of M.A.302, (a) to (h)
  • The AMP basis (M.A.302(d)) and when the AMP may depart from the ICA (M.A.302(e))
  • The content standard: Appendix I to AMC M.A.302 and AMC M.B.301(b)
  • Direct approval and the competent authority (M.1(3), M.B.301)
  • Indirect approval: conditions, scope (EASA FAQ 19061) and the CAME procedure
  • Safety-related tasks (EASA FAQs 48248 and 48249) and a routing map for any AMP change

  • The ICA package and the approval status of each document
  • How an MRB report is produced (CM-MRB-001, Industry Steering Committee, MSG-3)
  • MSG-3 systems analysis and failure effect categories 5 to 9
  • Structures, zonal, enhanced zonal (EWIS) and L/HIRF tasks
  • Reading an MPD line: task codes, source codes, applicability and interval notation
  • CS-23 aircraft and the utilisation assumption behind every interval

  • Classify 40 maintenance planning document lines by source, safety relevance, mandatory status and effectivity
  • Solve applicability formulas against a fleet configuration
  • Each group defends its classifications in the debrief

Day 2 — Building and changing the AMP

  • Why the ALS is part of the type design (21.A.31(a)(3); EASA FAQ 23797)
  • ALS content: life limits, damage-tolerance ALIs, CMRs, fuel system limitations, EWIS and LOV
  • One-star and two-star CMRs (AMC 25.19)
  • CDCCLs and fuel tank safety
  • ALS revisions and airworthiness directives (EASA FAQ 47406)
  • Part-26 ageing structures (26.370); WFD, LOV and CPCP (AMC 20-20B)

  • EASA's recommended structure (UG.CAMO.00010-002) and compliance checklist (TE.CAMO.00011-002)
  • Section 0: document control and the approval sheet
  • Section 1: general requirements and declared utilisation
  • Section 2: programme basis and concept
  • Section 3: the minimum fields of the task table
  • Sections 4 to 6, revisions, temporary revisions and traceability

  • Draft Sections 0 to 2 of an AMP for a training fleet
  • Complete a task table with MPD tasks, ADs, life limits, STC ICA and operational-approval tasks
  • Decide effectivity per aircraft and mandatory status for every line

  • Thresholds, repeat intervals, units and 'whichever first'
  • When the clock starts: the CRS date (EASA FAQ 19102), components and new tasks
  • Forecasting due dates from real utilisation
  • Permitted variations: EASA recommended maxima, exceptions and the Part-ML difference
  • Escalation with evidence, and how it differs from a variation
  • Revision triggers and the submission package

  • Route 12 AMP change requests: the movement, the approval route and the rule that decides it
  • Calculate due dates for 10 cases, including 'whichever first' and permitted variations

Day 3 — Effectiveness, special cases and assessment

  • When a reliability programme is required (M.A.302(g); Appendix I to AMC M.A.302, section 6)
  • Programme objectives, elements and data sources
  • Indicators: PIREP rates, MTBUR, MTBF, no-fault-found, dispatch reliability and IFSD rate
  • Alert levels, and small fleets: engineering judgement and data pooling
  • From alert to corrective action, including ETOPS propulsion monitoring
  • The periodic effectiveness review and occurrence reporting

  • Calculate monthly and rolling rates against alert levels
  • Analyse component removals: MTBUR, MTBF and no-fault-found
  • Assess task-findings proposals and ETOPS propulsion data
  • Write one proposal for a reliability review board, with its approval route

  • Tasks linked to the specificity of operations (M.A.302(f))
  • ETOPS (AMC 20-6B Appendix 8) and the proposed move to EDTO (NPA 2025-12)
  • RVSM continuing airworthiness (AMC3 SPA.RVSM.105)
  • Low-visibility operations (SPA.LVO.105(e)) and PBN
  • Other operational requirements: flight recorders, ELT, weighing, emergency equipment
  • Change triggers and AMP Section 2.9

  • One programme per aircraft at a time (M.A.302(a))
  • Building a bridging check, task by task (UG.CAMO.00010-002 2.8)
  • AMP approval when an aircraft is transferred (ED Decision 2026/005/R)
  • Parking, storage and return to service (UG.CAMO.00010-002 2.7)

  • Part-M or Part-ML: the Article 3 scope
  • Declared or approved AMP (ML.A.302(b)) and its content (ML.A.302(c))
  • The minimum inspection programme: intervals and tolerance
  • When no AMP document is needed (ML.A.302(e))
  • CS-23 aircraft under Part-M

  • How a finding is raised and closed (CAMO.A.150)
  • Correction, corrective action and preventive action
  • Five AMP case studies traced to a rule and a root cause
  • The interfaces the AMP depends on
  • Human error traps in maintenance data, and the controls that remove them

  • 28 multiple-choice questions on the course content
  • Pass mark: 75%

Assessment & Certification

The four exercises are debriefed in class, so you see how your answers compare with a model answer. The course closes with a final assessment of 28 multiple-choice questions (three options, one correct answer) based on the course content.

A certificate of completion is issued to participants who attend the course and pass the final assessment with a score of at least 75%.

Learning Format

Live Virtual Classroom on MS Teams

Session Structure:

  • 3 days, approximately 6 contact hours per day
  • Short teaching modules, each ending in a practical group exercise
  • Exercises use Microsoft Excel workbooks and fictional training data
  • Final assessment at the end of Day 3

Regulatory Baseline

The course is built on the following EASA material:

  • Regulation (EU) No 1321/2014: Part-M, Part-ML and Part-CAMO, consolidated to include Regulations (EU) 2025/111 and 2026/100.
  • AMC and GM: as amended by ED Decisions 2026/002/R and 2026/005/R.
  • EASA guidance: user guide UG.CAMO.00010-002, compliance checklist TE.CAMO.00011-002 and the EASA FAQs cited in each module.

References are re-checked against the current consolidated texts before each delivery. Course material is for training only and is never approved maintenance data.

Course Information

  • Target Audience:
    CAMO engineers and airworthiness staff who develop, amend or review AMPs
  • Duration:
    3 days (approx. 6 contact hours per day)
  • Delivery:
    Live virtual (MS Teams), instructor-led
  • Certificate:
    On attendance and passing the final assessment (75%)
  • Course Code:
    AT-0026-00
Register Now

Prerequisites

  • Fluency in English
  • Working knowledge of continuing airworthiness (Part-M / Part-CAMO) recommended
  • A computer with Microsoft Teams and Microsoft Excel for the exercises

Who Should Attend

  • CAMO technical and airworthiness engineers
  • Continuing airworthiness managers and nominated persons
  • Maintenance programme engineers
  • Reliability engineers
  • Maintenance planning engineers
  • Compliance monitoring staff who audit the AMP process
  • Airworthiness review staff

What's Included

  • Three days of live, instructor-led sessions
  • Participant booklet
  • Four exercise workbooks with worked examples
  • Alert-level worked example, step by step
  • Final assessment and certificate of completion

Have Questions?

Ask about dates, group bookings or a private session for your CAMO.

Request Information Contact Us

Frequently Asked Questions

An aircraft maintenance programme (AMP) is the document that defines all scheduled maintenance for an aircraft: the tasks, their intervals and their sources. Under point M.A.302(a) of Regulation (EU) No 1321/2014, the maintenance of each aircraft must be organised in accordance with an AMP.

Under EASA Part-M, the competent authority approves the aircraft maintenance programme and its amendments (M.A.302(b)). Where a CAMO or CAO manages the aircraft, amendments may instead be approved through an indirect approval procedure in its exposition, once the authority has approved that procedure (M.A.302(c)).

Direct approval means the competent authority approves the AMP change itself (M.A.302(b)). Indirect approval means the CAMO or CAO approves the change under a procedure the authority has already approved in its exposition (M.A.302(c)). Indirect approval is limited in scope and cannot be used to escalate safety-related tasks.

No. Point M.A.302(e) states that indirect approval is not permitted for the escalation of safety-related tasks. EASA FAQ 48248 identifies safety-related tasks as MSG-3 failure effect category 5 and 8 tasks, structural significant items, L/HIRF tasks and stand-alone EWIS tasks.

According to EASA FAQ 19061, indirect approval can cover changes to non-safety-related tasks, de-escalation (making intervals more restrictive), the addition of tasks, and editorial corrections. Changes to airworthiness limitations and escalation of safety-related tasks remain outside its scope.

Under point M.A.302(d), an aircraft maintenance programme must demonstrate compliance with the instructions issued by the competent authority and with the instructions for continuing airworthiness (ICA) issued by type-certificate, supplemental type-certificate and other design approval holders.

The content of an EASA aircraft maintenance programme is set out in Appendix I to AMC M.A.302. EASA user guide UG.CAMO.00010-002 recommends seven sections: 0 document control, 1 general requirements, 2 programme basis, 3 task table, 4 review and approval, 5 permitted variations, and 6 reliability.

No. The Airworthiness Limitations Section is part of the type design under point 21.A.31(a)(3) of Part 21. ALS items can only be changed through the type design, by the design approval holder with EASA, and are never escalated or varied through the aircraft maintenance programme.

When an ALS revision introduces a new or more restrictive task, EASA's policy (FAQ 47406) is to issue an airworthiness directive. The AD mandates the revised task and the revision of the aircraft maintenance programme, with a compliance time.

Point M.A.302(h) requires periodic reviews of the aircraft maintenance programme. AMC M.A.302 states that the programme details should be reviewed at least annually. Events such as an airworthiness directive or a design approval holder revision can require an amendment sooner.

Under point M.A.302(g), an aircraft maintenance programme must include a reliability programme for complex motor-powered aircraft when the AMP is based on maintenance steering group logic, such as MSG-3, or on condition monitoring. Appendix I to AMC M.A.302 states this applies irrespective of fleet size.

A permitted variation is a one-time, short extension of a task for a single aircraft on a single occasion; the next due date is counted from the previous due date. An escalation is a permanent change of a task interval in the AMP, justified by in-service or reliability data.

No. EASA user guide UG.CAMO.00010-002 (section 5.1.2) states that permitted variations do not apply to mandatory tasks, including airworthiness directives, airworthiness limitation items, certification maintenance requirements, fuel airworthiness limitations, life-limited items and aircraft weighing.

An AMP bridging programme is used when an aircraft previously covered by a different maintenance programme enters a new one, as described in EASA user guide UG.CAMO.00010-002 (section 2.8). It closes the gaps between the two programmes so the aircraft is maintained to one AMP at a time.

Under point ML.A.302, a Part-ML aircraft maintenance programme is either declared by the owner or approved by the CAMO or CAO managing the aircraft; it is not approved by the competent authority. The programme may be based on the minimum inspection programme or on the design approval holder's instructions.

The AMP development course is designed for CAMO technical staff who develop, amend or review aircraft maintenance programmes under EASA Part-M and Part-CAMO. It focuses on point M.A.302, its AMC and the related EASA guidance.

The AMP development course runs over three days and is delivered live on Microsoft Teams by an instructor. It combines short teaching modules with four practical exercises completed in small groups.

The AMP development course covers the EASA regulatory framework and M.A.302, direct and indirect approval, task sources (MRB report, MPD and MSG-3), airworthiness limitations and ageing aircraft, AMP format and document control, intervals, variations and escalation, reliability programmes, special operations (ETOPS, RVSM, LVO), transition and storage, Part-ML, and common audit findings.

The AMP development course includes four exercises: classifying maintenance planning document lines by source, safety relevance, mandatory status and effectivity; building a mini-AMP; routing AMP changes and calculating due dates; and analysing reliability data to support an AMP proposal.

Yes. The AMP development course ends with a final assessment of 28 multiple-choice questions based on the course content, with a pass mark of 75%.

Yes. Participants who attend the AMP development course and pass the final assessment with a score of at least 75% receive a certificate of completion.

No. EASA does not approve this type of training course. Each CAMO sets its own staff competence requirements under its procedures (see point CAMO.A.305), and the course is designed to support that competence.

No. The exercises use a fictional training fleet and data written for teaching. Course material is for training only and is never approved maintenance data; in practice, always work from the current instructions and approved data for your aircraft.

Ready to Build AMPs That Stand Up to Review?

Three days of rules, method and practice for the engineers who own the maintenance programme.